EVENING
STAR

by Mike Male & Bob Hillyer


48K ZX Spectrum, ZX Spectrum Plus,
ZX Spectrum 128, ZX Spectrum +2
Amstrad CPC 464, CPC 664 and CPC 6128
Commodore 64 and 128
BBC Model B OS 1.2, B+ and Master,
Acorn Electron


INTRODUCTION

Welcome to the "Evening Star", the second steam locomotive simulation from
Hewson. The "Evening Star" was one of the most powerful steam locomotives of
the British Railways fleet, one of the legendary BR9F Class, pulling its
passenger train over the undulating countryside of the old Somerset and Dorset
line between Bath and Bournemouth. You must take the roles of both Fireman and
Driver. There are many levels of simulation. We suggest you read the
instructions carefully then watch the computer demonstration for a few minutes.
Study the control settings and then attempt the Training Run. Gradually you
will improve your skill and will eventually be able to take the "Evening Star"
to Bournemouth in accordance with the timetable, using the coal and water
available to the optimum efficiency.

To load the game follow the instructions below for your make of computer and
wait until the main menu appears on the screen. Note that after about one
minute the computer will automatically select a high speed run showing the
whole of the line. To return to the main menu press X.


LOADING

Spectrum Cassette
48K ZX Spectrum, ZX Spectrum Plus or ZX Spectrum 128 with cassette player, ZX
Spectrum +2.

You are advised to disconnect all hardware from the rear edge connector. Unless
using a ZX Spectrum +2 connect a cassette player to the computer in the usual
manner. ZX Spectrum +2 and 128 users should select 48K mode. Rewind the
cassette if necessary, enter LOAD " " on the computer keyboard and press the
ENTER key. Press the Play key on the cassette player. The game takes a few
minutes to load.

Amstrad Cassette
Amstrad CPC 464
Amstrad CPC 664 or Amstrad CPC 6128 with cassette player and suitable leads.

Amstrad CPC 664 and CPC 6128 users should connect a cassette player to the
computer and enter | tape and press the ENTER key. Place the cassette in the
player, rewind if necessary and press the CTRL and ENTER keys. Press the Play
key on the cassette player and then any key on the computer keyboard. The game
takes a few minutes to load.

Amstrad Disc
Amstrad CPC 6128 or Amstrad CPC 664
Amstrad CPC 464 with disc drive

Amstrad CPC 464 users should connect a disc drive to the computer and enter
| disc and press the ENTER key. Place the disc in the drive and enter run "disc
and press the ENTER or RETURN key. The game takes a few seconds to load.

Commodore Cassette
Commodore 64 or Commodore 128 with suitable cassette player.

Connect the cassette player to the computer, place the cassette in the player
and rewind if necessary. Press the SHIFT and RUN/STOP keys on the computer
keyboard and press the Play key on the cassette player. The game takes a few
minutes to load.

Commodore Disc
Commodore 64 or Commodore 128 with disc drive.

You are advised to disconnect all hardware from your computer. Connect the disc
drive to the computer and place the disc in the drive. Enter LOAD "*", 8, 1 and
press the RETURN key. The game takes a few seconds to load.

BBC and Electron Cassette
Connect the cassette player to the computer, place the cassette in the player
and rewind if necessary. Enter CH. " " and press the RETURN key. Press the Play
key on the cassette player. The game takes a few minutes to load.

BBC Disc
Connect the disc drive to the computer and place the disc in the drive. Press
the SHIFT and BREAK keys together. The game takes a few seconds to load.


GETTING STARTED

Selecting the Demonstration

Load the program in the usual way and press key 0 when the main menu appears
and then press the RETURN key when the timetable is displayed. The locomotive
will pull slowly away from Bath, accelerating down the line on a local non-stop
train to Evercreech Junction. Observe the various controls and study the
readings on the gauges. Press CTRL+X to return to the main menu (on the
Spectrum press CAPS SHIFT+X).

HIGH SPEED RUN

If RETURN is pressed when the main menu appears the program executes a High
Speed Run along the entire line. You will be able to see all the features along
the way pass in quick succession. To exit press X.

STARTING A TRAINING RUN

Press 1 when the main menu appears and 1 again for the locomotive control menu.
This will give you control of the Regulator, Cut Off and Brake only. The
remainder of the controls will be adjusted by the computer. Read the schedule
displayed and then press RETURN.

With the locomotive standing at Bath Station open the Cut Off fully by pressing
C four times. Half open the Regulator by pressing R twice. After 15 seconds or
so the locomotive will pull slowly along the platform and out of the station.

Observe your speed display and when you are travelling at four miles per hour
or faster press R twice more to open the regulator fully. The locomotive will
then accelerate more rapidly as it moves past the Gasometer and up the steep
incline of Devonshire Bank. If you open the regulator too soon the locomotive
driving wheels will slip on the running rails leading to a loss of speed and
wasting steam (this is indicated by a sudden increase in the sound speed).

You may have noticed that when the computer has total control on the
Demonstration run that it reduces the Cut Off when the train is moving. This
uses steam more efficiently and you should do the same to conserve as much
steam as possible to enhance your Economy rating at the end of the run.

To exit from a Training Run (or any other run except the high speed) press
CTRL+X (on the Spectrum use CAPS SHIFT+X).

SCREEN LAYOUT

The main part of the screen is the view of the cab, the controls and the line
ahead. Above this is a sign naming the next station or line feature that you
will encounter. Below is the message area to relay important information to
you, the driver. To the side of the view screen is various control information
including your speed, the amount of coal and water remaining, the status of the
next signal, the current gradient and the profile for the next 1� miles, the
actual time and the position of the locomotive relative to Bournemouth and to
Bath Junction which is � mile from Bath Station. Historically, it is from this
position that all mileages are measured on the Somerset and Dorset line.

THE CONTROL KEYS

Locomotive Control Keys

CONTROL INCREASE DECREASE
SETTING SETTING
Regulator R SHIFT+R
Vacuum Brake V SHIFT+V
Cut Off C SHIFT+C
Blower B SHIFT+B
Injector I SHIFT+I
Firedoor F SHIFT+F
Damper D SHIFT+D
Sound Whistle W
Stoke Fire RETURN/ENTER
Spectrum users note that SHIFT refers to Symbol Shift

Program Control Keys

FUNCTION KEY
Toggle between accelerated and real-time A
Toggle between smoke on and off S
Return to main menu CTRL+X (or CAPS SHIFT+X)
Hold, wait for RETURN/ENTER to restart H
Display timetable T
Acknowledge message SPACE BAR
Increase engine noise N
Decrease engine noise SHIFT+N
N.B. Noise controls are only on computers without external volume controls.

To enable you to judge whether or not you are burning your coal efficiently the
following keys may be pressed to simulate the various states of combustion.

Smoke Demonstration Keys

SMOKE LEVEL KEY
Very light smoke - far too much air 1
Light smoke - too much air 2
Correct smoke level 3
Dark smoke - insufficient air 4


MENUS, MESSAGES AND SPEED LIMITS

The Main Menu

LEVEL SUMMARY
RETURN High Speed Run - Selected automatically after 1 minute
0 Computer Demonstration - Computer controlled non-stop run to Evercreech
Junction
1 Training Run - Identical run and schedule to level 0 with you in
control
2 Local non-stop run with added complication of speed limits
3 Local stopping train with speed limits and signals to contend with
4 Full line stopping train to Bournemouth with speed limits and
signalling
5 Try to break the record for the fastest non-stop run to Bournemouth
6 Drive the prestige "Pines Express" to Bournemouth, time errors are
marked severely
7 Any schedule with extra problems

Speed Limits

HAZARD LIMIT
Permanent Way Working 30 mph
Passing from single to double track or vice versa 40 mph
Passing or near Siding, Junction or Loop 40 mph
Overall line limit speed 70 mph

Note that excessive violation of the 40 mph or 70 mph limits will result in
derailing the Train.

Error Messages

ERROR MESSAGE MEANING
FATAL ERRORS
Fusible plugs gone Water level in the boiler too low
Boiler overfill Water level in the boiler too high
Overran stop signal Passing a stop signal in the down position
Unsafe reversing Allowing the train to run backwards
Blowback Failure to open the Blower in a tunnel or when the
regulator is shut
Derailed Excessive violation of speed limit
Crashed at B'mouth Hit buffers at too high a speed
Collision Colliding with oncoming train in single line section due
to lack of token

NON-FATAL ERRORS
Poor stop at Failing to stop close enough to the far end of the
platform
Short stop at Failing to stop for the full 60 seconds minimum at a
station
Rough stop at Using vacuum brake setting 3 or above when coming to a
halt at a scheduled station
No stop at Failing to stop at a scheduled stopping station
No whistle at Failing to blow whistle before starting off, or before a
tunnel or permanent way work
Hit buffers at Failing to come to a halt before the buffers when
arriving at Bournemouth
Em brakes at Using vacuum brake setting 4 (maximum)
Speeding near Failure to observe speed limit
No token at Failure to pick up token upon entering a single line
section, because of excessive speed


RUN OPTIONS IN DETAIL

Option 0 Computer Demonstration Run

This run demonstrates the various techniques required to drive the locomotive
with the computer running all controls on a local non-stop run to Evercreech
Junction. You are advised to study the various settings used to help you learn
correct driving methods. Should you wish to hold the run at any stage you can
do so by pressing "H" which will stop the run and await the press of RETURN (or
ENTER if that is the key on your computer). Also you can accelerate the run so
that time passes four or five times quicker than normal by pressing "A" (note
the rapid movement of the clock display). Press "A" again to return to normal.
This is useful during some of the longer stretches of the run. You have control
over whether or not the smoke is displayed by pressing "S".

Option 1 Training Run

A practice session for the novice driver/fireman with the same schedule as the
computer demonstration. You are expected to adhere to the timetable exactly.
Any deviation from the times shown will be penalised at the end of a run in the
time score. You can halt the program to consult the timetable at any time by
pressing "T". The timetable with any completed times will be displayed. From
this part of the program you can also check for any errors by pressing "E" or
save the position of the run to date by pressing "S" (see the section on Saving
and Loading a run). A short beep is sounded to assist you when the computer
records a time for the timetable. Note that the times shown on the timetable
are minutes only. It should be apparent from the time displayed to which hour
each refers.

When arriving at Evercreech Junction you must bring the train to a halt near to
the end of the platform so that all your passengers may alight safely. You must
also bring the train to a halt without the use of heavy braking. Emergency
braking (maximum braking) should not be used at any time due to the risk to
your passengers and will result in a loss of safety score.

You will be penalised for any mismanagement of locomotive controls that you
have elected to control yourself. Correct methods of use are detailed in the
accompanying notes "How a Steam Locomotive Works" and all such methods are
practiced by the computer when it has control.

At the end of a run your performance is assessed with regard to economy, safety
and timekeeping. A result of 70% overall is considered acceptable. The economy
assessment is based upon the stocks of coal and water remaining. The page of
errors and events can, once again, be displayed in place of the timetable by
pressing "E".

If by some misfortune you have committed a fatal error and the run has been
terminated before the end of the timetabled run, you may resume the run from
the point of catastrophy by pressing "R". Timekeeping and economy assessments
are unaffected by the premature end, but safety will be zero. Upon resumption
of a run, the computer will have taken some action to prevent an immediate
recurrence of whatever problem you have encountered. However, you may have to
take some more permanent action to prevent further mishap.

Option 2 Short non-stop with Speed Limits

A train on a non-stop local run, where speed limits are in force at many places
down the line. Each one is associated with a line feature, and can be
identified visually. The position of each is shown on the gradient profile by
the letter S or by the change in track type. The major speed limits are of 40
mph and they are associated with positions where the track splits from single
to double or vice versa, near junctions where another track can be seen joining
the main line, or where there is a siding beside the track or a passing loop
(characteristic of some single line stations). Failure to observe these limits
will result in a loss of safety marks and in extreme cases derailment.

There is another form of speed limit also of 40 mph in that you must enter each
section of single track at or below that speed. This is so that a "token
transfer" may take place, the "token" being an object which is held by a
particular train to ensure that only one train at a time may use a single track
section. Failure to achieve token transfer is dangerous as you run the risk of
collision with an oncoming train. When successfully held the token is shown at
the top right of the cab.

Whilst passing near permanent way work you, are expected not to exceed 30 mph.
Passing at speeds in excess of this will result in a loss of safety marks but
there is no derailment risk. Permanent way working affecting the line will be
notified at the start of the run.

There is an overall limit of 70 mph for the entire line.

Option 3 Short Stopper and Signalling

In addition to the speed limits of Option 2 you must also obey all signals and
make the stops demanded by the timetable.

Signals divide the line into sections so that trains on the same line run at an
adequate distance from each other. There are two types of signal used on this
line, stop (with a square end) and distant (with a notched end). Each has two
positions; up for clear and down (horizontal) for stop or caution. Stop signals
may come singly or in groups.

You must not pass a stop signal in the down (stop) position. To give warning
of the condition of the stop signal a distant signal is placed a suitable
distance before it. It will be down (caution) if the stop signal to which it
refers is down i.e. at the stop position.

In order for you to have the maximum time to react the state of the next signal
to be passed is reproduced separately in the signal section of the screen.

The stations at which you are scheduled to stop are shown in capital letters on
the timetable. You must attempt to stop close to the far end of the platform
once again without excessive braking. Should you pass the end of the platform
before the train has come to a halt a beep will sound and you will be assessed
as not stopping at a required station and you will be penalised as such.

You must arrive at the station in good time to allow at least one minute for
your passengers to embark and disembark. If the computer is controlling the
whistle, it will sound exactly one minute after arrival. Should you be in
control of the whistle you must ensure that it is blown before setting off. The
timetable gives the required departure time.

Option 4 Long Stopper

A train which runs the entire length of the line from Bath to Bournemouth with
intermediate stops. All the constraints of previous options apply.

Option 5 Record Run

This is a full line non-stop train with a timetable, that will allow you to
complete the journey to Bournemouth in record time. Any run which arrives at
Bournemouth on time can be considered good. Arriving early is outstanding.

Option 6 Pines Express

This is the premier train to run the line. You are expected to maintain the
prestige of the Railway company and adhere to the timetable scrupulously. Any
errors in this area will be more severely punished than usual.

Option 7 Problem Run

You will be presented with any timetable, all constraints apply. However, you
will also have another serious problem to contend with to make your task a
little more difficult. You may be passed a message below the main screen. Once
read it can be acknowledged (and therefore wiped) by pressing the space bar.


SAVING AND LOADING A RUN

Because a complete run can take in excess of 2 hours in real time we have given
you the facility to save the current position to reload later. This is done
from within a run by pressing "T" then "S" when prompted.

Disc users are further prompted to type in a file letter (A to Z) by which this
particular run can be identified.

Tape users are recommended to ensure that the tape is beyond any leader section
at the beginning of a tape before attempting to record a run. Failure to do
this may result in the run not being successfully recorded.

MACHINE NOTES

Acorn Electron: Because of the amount of memory space taken up by "Evening
Star" it has been necessary to use some of the memory needed for the Plus 1
interface. Consequently, "Evening Star" will run on the Electron with Plus 1
connected but the save and load feature will not work.


-------------------------------------------------------------------------------
| EVENING STAR HISTORICAL NOTES |
| On the 8th September 1962 the locomotive "Evening Star" pulled the "Pines |
| Express" from Bournemouth to Bath and back. This was the last time this |
| train took the route over the Somerset and Dorset line to Bath, it being |
| subsequently diverted via Reading and Basingstoke. This diversion of |
| traffic from the Somerset and Dorset line sealed the demise of the line |
| which was closed in 1966. This was the end of a picturesque and much loved |
| railway with a long and glorious past. |
| |
| The Somerset and Dorset line's history starts in 1852 when the then |
| Somerset Central Railway was building its line from Burnham-on-Sea to |
| Glastonbury. They built a pier at Highbridge on the Bristol Channel and so |
| had steamboat connections for both passengers and freight to the industries |
| of Southern Wales. Meanwhile the Dorset Central Railway was building a line |
| from Wimborne, north-west to Blandford. |
| |
| In 1862 the two companies merged to form the Somerset and Dorset Railway, |
| extending the existing lines to meet at Cole. The company thus achieved its |
| primary objective of having a coast to coast route from Highbridge on the |
| Bristol Channel to Poole on the English Channel. At one time the company |
| offered services from South Wales and Bristol to Cherbourg, via its line to |
| the English Channel and thence by steamship. Traffic, although adequate, |
| was not sufficient to financially secure the line so the company looked at |
| other areas from which to attract traffic. |
| |
| This led to the building of what was then called the "Bath Extension", a |
| branch off the then mainline over the Mendip Hills to Bath connecting with |
| the recently built Midland Railway station there. The S & D, although |
| already financially hard pressed, managed to complete the line in only 2 |
| years but because of cost it was built as single line only. The new line |
| involved many tunnels, viaducts and earthworks in contrast to the existing |
| line. It did however run through the North Somerset Coalfield, thus giving |
| the company access to mineral traffic. |
| |
| On the 20th July 1874 the first S & D train used Bath station and the |
| company's new North-South route was complete. It was at this time that the |
| company first acquired the label Slow and Dirty (for S & D) which stuck |
| with it to the end and is still familiar today (although it had also been |
| dubbed "Swift and Delightful" but never so often). |
| |
| Traffic on the new route was good but the company, after its extension to |
| Bath, was financially exhausted and in 1875 they had no alternative but to |
| ask wealthier neighbours to buy it out. The Great Western Railway (who |
| controlled many of the adjacent areas to the North and West) was approached |
| as was the London and South Western Railway (who controlled the areas to |
| the South and East, most importantly where the S 8 D crossed the L & SWR at |
| Templecombe and at Wimborne where they connected for the last miles to |
| Poole and Bournemouth). |
| |
| The L & SWR saw the Midland Railway as a better partner with which to run |
| the line, having the line North from Bath from the S & D's line. The L & |
| SWR and the MR thus jointly leased the S & D line, leaving the GWR somewhat |
| aggrieved at being left out, and the S & D became the S & D Joint Railway. |
| |
| In 1923 the railway companies of Britain merged into four large companies. |
| The MR became part of the London Midland and Scottish Railways and the L & |
| SWR became part of the Southern Railway. Thus the line was still jointly |
| run, the LMS taking responsibility for the locomotives and stock and the SR |
| for the track and signalling. By this time Bath to Bournemouth had become |
| the main line, with doubling of track where possible, and the Highbridge |
| line was reduced to a branch. Trains from the North to the South would |
| route via Bath then over the S & D to the South coast and Bournemouth as |
| the town and resort grew in importance. The "Pines Express" originated in |
| Manchester and took its name from the Pine trees of the Bournemouth area. |
| |
| The section from Bath to Bournemouth over the S & D started with a climb up |
| and over the Mendip hills to Evercreech. The trains often had many coaches |
| (especially in summer) and needed two locomotives to get them up and over. |
| At Bath this could be a helper or "Banker" at the rear of the train to help |
| with the climb up Devonshire bank. It would drop off at the top and return |
| to Bath. More commonly with passenger trains two locos would be coupled at |
| the front for the trip to Evercreech Junction where one would be uncoupled |
| and used to assist trains over the Mendips in the other direction. "Double |
| heading" was very expensive in terms of locos and men but unavoidable |
| because of the steep gradients in that section of line. |
| |
| Another factor affecting the line in the latter years was the seasonal |
| nature of its traffic. In winter the line was adequate for its task and |
| coped with its local and freight traffic, the various single line sections |
| not proving a problem. However, during the summer season (at weekends in |
| particular) trains from all over Northern England would be using the line |
| requiring "double heading" over the Mendips and every available loco was |
| pressed into service. This high loading inevitably caused delays on the |
| single line sections and so perpetuated the reputation of the line for |
| being "Slow and Dirty". |
| |
| In 1960 a class of locomotive new to the line was tested. This was one of |
| the 9F British Rail standard types, one of a range of BR locomotives |
| designed and built after nationalisation in 1948. The new locos were aimed |
| at improving operating efficiency and ease of maintenance, and were to be |
| used throughout BRs network. The 9F was designed and built as a heavy |
| freight locomotive and first ran in 1954. They were arguably the most |
| successful of BRs standard types with over 200 examples being built. The 9F |
| was to be tried on the S & D not as a freight loco but as a passenger |
| locomotive to see if it could pull, "single headed", the heavy passenger |
| trains of the summer thereby eliminating "double heading". The trial took |
| place in March 1960 and was a great success, four 9Fs then being allocated |
| to Bath for the summer. |
| |
| In this class of locomotive many saw the saviour of the line but the 9Fs |
| could never be fully utilised for several reasons. Firstly its size. Such a |
| powerful locomotive was too big for the turntables of the S & D and so was |
| not useful for the freight trains to Evercreech. Secondly, because of its |
| freight train origins it had no facility to provide heating for the coaches |
| it pulled and was therefore limited to summer use only. In the final |
| summers of through train operation on the S & D the 9F made light work of |
| the "Pines Express" single handed. It is worth noting that it was no easy |
| task for the fireman on such a locomotive to keep the fire's appetite for |
| coal satisfied. |
| |
| In 1962 the last 9F of the class was sent to Bath shed to haul the last |
| "Pines Express" over the S & D. This was 92220 Evening Star built in the |
| Swindon works and delivered to BR in 1960. After the summer of 1962 the |
| "Pines Express" although still run was routed away from the S & D, as were |
| many other through trains. Local services survived but the line was being |
| groomed for closure. In 1965 its terminus at Bournemouth West was closed |
| and later demolished. In 1966 after much acrimony the entire line was |
| closed completely. |
| |
| No part of the original S & D line now exists but its spirit is kept alive |
| by a preservation group now based on the West Somerset Railway at Washford |
| - The Somerset & Dorset Railway Trust. 1987 is the 125th anniversary of the |
| S & D. "Evening Star" has been preserved and still pulls enthusiasts' |
| trains but not, sadly, over the S & D. The station at Bath - Green Park has |
| also survived and has been preserved, the track bed now being used as a car |
| park for a supermarket. |
-------------------------------------------------------------------------------


CREDITS

Written by Mike Male and Bob Hillyer. Published by Hewson Consultants Ltd.
(C) Hewson Consultants Ltd 1987.
The program and data on this medium are copyright and may not be reproduced in
part or in total by any means without the written permission of Hewson
Consultants Ltd. All rights reserved. No responsibility is accepted for any
errors.

Our policy is one of constant improvement. Therefore, we reserve the right to
modify any product without notice.

Hewson Consultants Ltd
56B Milton Trading Estate
Milton, Abingdon
Oxon OX14 4RX


Evening Star

How a Steam Locomotive Works

These notes describe the operation of a steam locomotive with a particular
reference to the screen display and controls of Evening Star. Understanding how
a steam locomotive works will help you to master the controls more quickly.

The driving force of the locomotive comes from the cylinders where a piston is
pushed back and forth by the steam pressure raised in the boiler. Hot gasses
from the firebox are drawn through the boiler by a system of tubes, which heat
the water to boiling point, converting it into steam. The hot gasses drawn
through the boiler then enter the smokebox and escape through the chimney. The
performance of the locomotive depends upon the pressure in the boiler, which
can be controlled by manipulating the fire.

WATER GAUGES

These are two vertical tubes in the centre of the cab. They are very important
as they give a visual indication of the level of water in the boiler. The
bottom of the gauge is one inch above the firebox top, which must be kept
covered at all times otherwise the fire will heat the firebox top beyond limits
causing special plugs (called fusible plugs) to melt allowing steam into the
firebox. This action cools the fire and alerts the train crew.

If too much water is carried in the boiler and the gauge reaches the top, water
instead of steam will enter the cylinders causing permanent damage.

Ideally you should attempt to maintain a water level in the top half of the
gauge. Should a failure occur, the run will be terminated with the
consequential loss of marks.

STEAM PRESSURE GAUGE

A round dial with a needle pointer, situated in the centre of the cab,
graduated from minimum on the left to maximum (200 psi) on the right. The more
steam pressure maintained the higher the potential power of the locomotive.
However too much pressure will lift the safety valves and release steam thereby
reducing pressure to below maximum (shown by two jets of steam issuing from the
boiler top). This represents a waste of coal and water and should be avoided to
achieve maximum efficiency.

WHISTLE

The whistle is part of the safety equipment and must always be used before
starting away, entering tunnels or approaching sections where permanent way
gangs (railway maintenance teams) are working. To conserve steam the whistle
should not be used indiscriminately.

As a guide to correct whistle usage, when the computer is controlling the
whistle it is blown at the earliest time in each of the circumstances detailed
above.

REGULATOR

A lever situated on the top left of the cab which controls the flow of steam to
the cylinders. It has five positions, closed on the right, progressing to fully
open on the left. Opening the regulator applies power to the wheels and it must
be adjusted when running to suit requirements. Always close the regulator when
braking. Open the regulator cautiously when starting away as too much power
will cause the wheels to slip (especially in adverse weather conditions). Wheel
slip will be apparent from the increase in the speed of the steam exhaust.

CUT OFF

A wheel control on the bottom left (marked C) which controls the time during
each cylinder cycle that steam is allowed into the cylinder. It has five
positions, 0% (straight up), 20%, 35%, 55% and 75% (straight down). For example
when the cut off is set to 20%, steam is allowed to enter for just 20% of the
cycle. This has the effect that the expansive properties of steam are used more
efficiently, by reducing the steam usage significantly for only a small loss of
power. You will need to use this control to obtain high efficiency. When
starting away it is normal practice to use 75% cut off.

VACUUM BRAKE

A wheel control situated between the regulator and the cut off (marked V) which
has five positions; off (straight up), light braking, medium braking, heavy
braking and emergency braking (straight down). The brakes act upon all the
carriages and are held off by maintaining a vacuum in a pipe connecting the
carriages, braking being achieved by progressive release of the vacuum via the
vacuum brake control.

In the event that the communication cord of the train is pulled, emergency
braking is automatically applied and will be released as appropriate. Emergency
braking must not be used by the driver except in extreme circumstances, as a
poor safety rating will result. Avoid using harsh braking to bring the train to
a halt at a station for the comfort of your passengers.

BLOWER

A wheel control situated centre right of the cab (marked B) which is off when
pointing straight up. It is essential that at all times gasflow is maintained
drawing the gasses from the firebox out through the chimney ensuring that no
flames or gasses are allowed to escape into the cab via the firehole doors.
Normally this gasflow is supplied by the exhaust of used steam up the chimney
when the regulator is open. This gasflow will be interrupted by closing the
regulator or by the confines of a tunnel. In these circumstances normal gasflow
must be maintained by opening the blower which sends a jet of live steam up the
chimney. Failure to use the blower when necessary is dangerous and can lead to
an "explosive blowback" into the cab. Use of the blower should be limited to
only when necessary due to its cost in the loss of steam.

INJECTORS

A wheel situated top right of the cab (marked I), which controls the device by
which water from the tender is forced into the boiler. It has five positions,
off (straight up), progressing to full on (straight down). This is the means by
which the level of water in the boiler is maintained.

DAMPERS

A wheel situated on the bottom right of the cab (marked D) which controls the
amount of air provided through the base of the fire (called primary air). It
has five positions, closed (straight up) progressing to fully open (straight
down). By control of the amount of primary air it is possible to vary the
temperature of the fire and thereby the amount of water evaporated into steam.
To achieve a hot fire a large amount of primary air is required for combustion.
Conversely for a cool fire only a small amount of primary air is required. To
help you judge the temperature of your fire a thermometer style temperature
gauge is presented in the cab centre. The indication of correct combustion is
the colour of your smoke such that black smoke would indicate insufficient air
for the temperature of the fire, grey smoke indicates correct air and lighter
shades indicate too much air. If too little air is supplied coal combustion
will not provide the maximum heat value. If too much air is supplied, heat will
be wasted in heating the excess air. To be efficient you must aim to maintain
the correct air supply as far as possible. (Whilst manipulating the fire
temperature correct combustion is unlikely). The rate at which coal is consumed
increases with the temperature of the fire.

FIREHOLE DOORS

A pair of steel doors used to confine the fire and to control the flow of air
over the fire (secondary air). To achieve optimum temperatures of the fire, the
level of coal must be maintained in the middle third of the firebox. Coal
levels outside these parameters cannot achieve maximum temperatures. You must
fully open the firedoors whilst coal is being added (indicated by a shovel at
the top right hand corner of the display). Failure to do so will waste coal. In
all but the highest level of control the computer will do this for you. For
perfect combustion a small amount of secondary air may be required.

The firedoors can also be used to assist in the manipulation of fire
temperature. For example to raise the temperature of the fire "quickly" keep
the firedoors shut, and to lower the temperature "quickly" open wide.

GRADIENTS

Railway lines are not level and steam railway locomotives are affected by the
gradient of the track. The gradient is indicated in the same manner as road
gradients, e.g. 1 in 100. This would indicate a slope up or down of one foot
for every 100 feet travelled. A cross section of the gradients of the line
together with the positions of the stations and tunnels is shown in the
gradient profile included. The exact gradient of the track at any particular
time may be displayed in the signalling area.

Vacuum brakes must be used to ensure that the train is never allowed to run
backwards on an up gradient.

(C) Hewson Consultants Ltd. 1987