| Game Manual: | N/A | | Game Music: | N/A |
| The player controls a small vehicle that can move laterally, and tries to avoid incoming potholes. If the player hits a pothole they're temporarily slowed, with the goal is to reach the finish line in the minimum time. |
|
Play your favorite classic games and more with the GameEx front end. Read more. |
|
|
|
|
|
|
|